The outputs from a work measurement study lead to the development of labor and equipment standards that are used for all of the following EXCEPT:
A) estimating workforce capacity.
B) determining fatigue and personal need allowances.
C) determining the cost of new work procedures.
D) providing accurate information for scheduling and sequencing.
Correct Answer:
Verified
Q12: In the sample size for work sampling,
Q13: A 90 percent learning curve implies faster
Q14: After developing a predetermined standard, stopwatch or
Q15: Allowances include time for all of the
Q16: A performance rating factor (PRF) of 1.15
Q18: When timing a work activity with multiple
Q19: Normal time needs to be adjusted for
Q20: Which of the following is NOT part
Q21: Work standards _.
A) improve motivation if set
Q22: Define and relate normal time and standard
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents