Steve, an operations manager at Krypto InfoTech, must set up an assembly line to assemble a computer mouse. The precedent network given below is defined with task times in parentheses and stated in minutes. There are 480 minutes of assembly time per shift and there is one shift. The forecast (output rate) is 60 units per shift. He decides to use the longest/largest-task-time rule to assign tasks to workstations.
SHAPE \* MERGEFORMAT
Worksheet for assembly-line balancing problem
Use the previous assembly-line balancing (ALB) information to answer Questions .
-The task assigned to the third workstation (called C) using the longest/largest-task-rule is _____.
A) task 3
B) task 4
C) task 5
D) task 6
Correct Answer:
Verified
Q11: Which of the following statements is NOT
Q12: The typical layout of facilities in a
Q13: A _ layout consists of a functional
Q14: All of the following are limitations of
Q15: All of the following are common objectives
Q17: Identify an advantage of product layouts.
A) Highly
Q18: Which of the following statements is NOT
Q19: Steve, an operations manager at Krypto
Q20: Assembly-Line Balancing Problem-Table 1 below
The Florida
Q21: _ occurs when a work center completes
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents