Solved

Steve, an Operations Manager at Krypto InfoTech, Must Set Up

Question 16

Multiple Choice

Steve, an operations manager at Krypto InfoTech, must set up an assembly line to assemble a computer mouse. The precedent network given below is defined with task times in parentheses and stated in minutes. There are 480 minutes of assembly time per shift and there is one shift. The forecast (output rate) is 60 units per shift. He decides to use the longest/largest-task-time rule to assign tasks to workstations.
SHAPE \* MERGEFORMAT
 Steve, an operations manager at Krypto InfoTech, must set up an assembly line to assemble a computer mouse. The precedent network given below is defined with task times in parentheses and stated in minutes. There are 480 minutes of assembly time per shift and there is one shift. The forecast (output rate)  is 60 units per shift. He decides to use the longest/largest-task-time rule to assign tasks to workstations. SHAPE \* MERGEFORMAT      Worksheet for assembly-line balancing problem   \begin{array}{|c|c|c|c|} \hline \text { Workstation } & \text { Assigned Tasks } & \text { Total Time } & \text { Idle Time } \\ \hline \text { A } & & & \\ \hline \text { B } & & & \\ \hline \text { C } & & & \\ \hline \text { D } & & & \\ \hline \text { E } & & & \\ \hline \text { F } & & & \\ \hline \end{array}  Use the previous assembly-line balancing (ALB)  information to answer Questions . -The task assigned to the third workstation (called C)  using the longest/largest-task-rule is _____. A)  task 3 B)  task 4 C)  task 5 D)  task 6  Steve, an operations manager at Krypto InfoTech, must set up an assembly line to assemble a computer mouse. The precedent network given below is defined with task times in parentheses and stated in minutes. There are 480 minutes of assembly time per shift and there is one shift. The forecast (output rate)  is 60 units per shift. He decides to use the longest/largest-task-time rule to assign tasks to workstations. SHAPE \* MERGEFORMAT      Worksheet for assembly-line balancing problem   \begin{array}{|c|c|c|c|} \hline \text { Workstation } & \text { Assigned Tasks } & \text { Total Time } & \text { Idle Time } \\ \hline \text { A } & & & \\ \hline \text { B } & & & \\ \hline \text { C } & & & \\ \hline \text { D } & & & \\ \hline \text { E } & & & \\ \hline \text { F } & & & \\ \hline \end{array}  Use the previous assembly-line balancing (ALB)  information to answer Questions . -The task assigned to the third workstation (called C)  using the longest/largest-task-rule is _____. A)  task 3 B)  task 4 C)  task 5 D)  task 6 Worksheet for assembly-line balancing problem
 Workstation  Assigned Tasks  Total Time  Idle Time  A  B  C  D  E  F \begin{array}{|c|c|c|c|}\hline \text { Workstation } & \text { Assigned Tasks } & \text { Total Time } & \text { Idle Time } \\\hline \text { A } & & & \\\hline \text { B } & & & \\\hline \text { C } & & & \\\hline \text { D } & & & \\\hline \text { E } & & & \\\hline \text { F } & & & \\\hline\end{array} Use the previous assembly-line balancing (ALB) information to answer Questions .
-The task assigned to the third workstation (called C) using the longest/largest-task-rule is _____.


A) task 3
B) task 4
C) task 5
D) task 6

Correct Answer:

verifed

Verified

Unlock this answer now
Get Access to more Verified Answers free of charge

Related Questions

Unlock this Answer For Free Now!

View this answer and more for free by performing one of the following actions

qr-code

Scan the QR code to install the App and get 2 free unlocks

upload documents

Unlock quizzes for free by uploading documents