Jordan Manufacturing uses a predetermined overhead allocation rate based on direct labor cost.At the beginning of the year,it estimated the manufacturing overhead rate to be 20% times the direct labor cost.In the month of June,Jordan completed Job 13C,and its details are as follows:
What is the cost per unit of finished product of Job 13C? (Round your answer to the nearest cent. )
A) $150.76
B) $136.91
C) $130.79
D) $120.00
Correct Answer:
Verified
Q85: Haddows,Inc.completed Job GH6 last month.The cost details
Q86: Halcyon,Inc.completed Job 10B last month.The cost details
Q87: Jezebel,Inc.completed Job 12 and several other jobs
Q88: Clinton Manufacturing uses a predetermined overhead allocation
Q89: Happy Clicks,Inc.uses a predetermined overhead allocation rate
Q91: Venus Manufacturing uses a predetermined overhead allocation
Q92: The Quadrangle Fabrication Plant suffered a fire
Q93: Q-dot Manufacturing uses a predetermined overhead allocation
Q94: Felton Quality Productions uses a predetermined overhead
Q95: Iglesias,Inc.completed Job 12 on November 30.The details
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents