Weather Instruments assembles products from component parts.It has two departments that process all products.During January the beginning work-in-process in the assembly department was half completed as to conversion and complete as to direct materials.The beginning inventory included $12,000 for materials and $4,000 for conversion costs.Overhead is applied at the rate of 50 percent of direct manufacturing labour costs.Ending work-in-process inventory in the assembly department was 40 percent complete.All spoilage is considered normal and is detected at the end of the process.Beginning work-in-process in the finishing department was 75 percent complete as to conversion and ending work-in-process was 25 percent converted.Direct materials are added at the end of the process.Beginning inventories included $16,000 for transferred-in costs and $20,000 for conversion costs.Overhead in this department is equal to direct manufacturing labour costs.Additional information about the two departments follows:
Required:
Prepare a production cost worksheet using weighted-average for the assembly department and FIFO for the finishing department assuming that spoilage is recognized.
Correct Answer:
Verified
View Answer
Unlock this answer now
Get Access to more Verified Answers free of charge
Q86: New Image Sports uses a process costing
Q86: The calculation of equivalent units under standard
Q88: Wilson Sports uses a process costing system.Direct
Q95: Playtime Ltd.manufactures toys in two departments: Forming
Q96: Dutton Industries is a manufacturer of cleaning
Q109: In job costing, costs of abnormal spoilage
Q112: The costs of normal spoilage are usually
Q116: The standard-costing method
A)adds a layer of complexity
Q118: Spoilage can be attributed to a particular
Q150: Under standard costing, there is no need
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents