Figure 4
Wheat Manufacturing has four categories of overhead. The four categories and the expected overhead costs for each category for next year are as follows:
Currently, overhead is applied using a predetermined overhead rate based upon budgeted direct labour hours. For next year, 20,000 direct labour hours are budgeted.
The company has been asked to submit a bid for a proposed job. The plant manager feels that obtaining this job would result in new business in future years. Usually bids are based upon full manufacturing cost plus 15 percent.
Estimates for the proposed job are as follows:
In the past, full manufacturing cost has been calculated by allocating overhead using a volume-based cost driver--direct labour hours. The plant manager has heard of a new way of applying overhead that uses cost pools and cost drivers.
Expected activity for the four activity-based cost drivers that would be used are as follows:
-Refer to Figure 4. If Wheat Manufacturing used activity-based cost drivers to assign overhead and the company's bid is full cost plus 15 percent, the company's bid would be
A) £12,696.00
B) £13,965.60
C) £10,120.00
D) £9,936.00
Correct Answer:
Verified
Q14: Which of the following quantities is an
Q22: Resources that are only purchased precisely at
Q24: The overhead rates of the traditional-based approach
Q28: An example of a nonunit-level driver is
A)pounds
Q33: Committed resources are
A)hard to purchase.
B)purchased precisely at
Q35: Which of the following items would be
Q36: An activity cost driver is
A)a factor that
Q38: In an activity-based cost system, what types
Q61: Figure 2
The management of Chott Industries predicted
Q69: Figure 3
The Overdale plant has two categories
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents