Figure 1
Torino, SA., manufactures machine parts. Torino has developed a static budget for its plant at an activity level of 10,000 direct labour hours for the month of March. The actual level of activity was 11,000 hours. The following table summarizes the static budget and the actual costs for March:
-Refer to Figure 1. What is the flexible budget for March?
A) £28,800
B) £29,800
C) £30,900
D) £31,680
Correct Answer:
Verified
Q24: Goal congruence means
A)there is alignment of organizational
Q26: An example of a negative incentive is
A)promotion.
B)nonfinancial
Q29: Which of the following is NOT an
Q35: Which of the following is NOT a
Q42: Which of the following must be addressed
Q49: When top management assumes total control of
Q50: Controllable costs are those that a manager
A)has
Q55: Which budget should be used to determine
Q57: When the reaction to a budget is
Q58: A flexible-based budgeting system
A) uses functional-based line
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents