Aaron Company estimates direct labour costs and manufacturing overhead costs for the coming year to be $780,000 and $500,000,respectively.Aaron allocates overhead costs based on machine hours.The estimated total labour hours and machine hours for the coming year are 10,000 hours and 8000 hours,respectively.What is the predetermined overhead allocation rate?
A) $112.50 per labour hour
B) $97.50 per machine hour
C) $50.00 per labour hour
D) $62.50 per machine hour
Correct Answer:
Verified
Q11: When materials are requisitioned for a job,
Q16: In job order costing,the journal entry to
Q17: Which of the following would be included
Q18: Which of the following would be included
Q20: Indirect materials and indirect labour are tracked
Q22: Overallocation of manufacturing overhead would require which
Q23: Hermione Company completed Job GH6 last
Q24: When calculating the predetermined manufacturing overhead rate,what
Q25: The Quadrangle Fabrication Plant suffered a
Q26: In a manufacturing operation,property rates and insurance
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents