Solved

Figure 17-6 Figure 17-6 Shows Two Different Compensation Schemes

Question 228

Multiple Choice

Figure 17-6 Figure 17-6   Figure 17-6 shows two different compensation schemes for the Safelite Glass Corporation, an installer of auto glass windshields. Under Scheme I, the firm pays a consistent wage of $80 per day based on an 8-hour workday. Qmin represents the cut-off point under the hourly-wage system: if a worker installed fewer than Qmin windshields, the worker got fired. Scheme II represents a piece-rate scheme with an earnings floor: no worker would get less than $80 per day (for an 8-hour workday)  and would have to produce at least Qmin. For any output level beyond Q* the worker earned an additional $20 for each unit produced. -Refer to Figure 17-6. Suppose Qmin = 2 windshields and Q* = 5 windshields. Under Scheme II, a worker has to install Q* windshields before she earns an additional $20 per windshield installed. What is a potential problem with this scheme? A)  Workers might be more concerned with increasing output beyond Q* and less concerned with the quality of their work. B)  Any increase in output between Qmin and Q* benefits the employer only. C)  It violates labor laws because workers are not compensated for output between Qmin and Q*. D)  Workers have no incentive to produce output to between Qmin and Q*. Figure 17-6 shows two different compensation schemes for the Safelite Glass Corporation, an installer of auto glass windshields. Under Scheme I, the firm pays a consistent wage of $80 per day based on an 8-hour workday. Qmin represents the cut-off point under the hourly-wage system: if a worker installed fewer than Qmin windshields, the worker got fired. Scheme II represents a piece-rate scheme with an earnings floor: no worker would get less than $80 per day (for an 8-hour workday) and would have to produce at least Qmin. For any output level beyond Q* the worker earned an additional $20 for each unit produced.
-Refer to Figure 17-6. Suppose Qmin = 2 windshields and Q* = 5 windshields. Under Scheme II, a worker has to install Q* windshields before she earns an additional $20 per windshield installed. What is a potential problem with this scheme?


A) Workers might be more concerned with increasing output beyond Q* and less concerned with the quality of their work.
B) Any increase in output between Qmin and Q* benefits the employer only.
C) It violates labor laws because workers are not compensated for output between Qmin and Q*.
D) Workers have no incentive to produce output to between Qmin and Q*.

Correct Answer:

verifed

Verified

Unlock this answer now
Get Access to more Verified Answers free of charge

Related Questions

Unlock this Answer For Free Now!

View this answer and more for free by performing one of the following actions

qr-code

Scan the QR code to install the App and get 2 free unlocks

upload documents

Unlock quizzes for free by uploading documents