Custom Cedar Products (CCP) manufactures a line of outdoor furniture. In June, CCP received an order Outdoor Spaces for 25, 54 inch tables with umbrella stand. The order from Outdoor Spaces became Job 3300 at CCP. A Materials requisition for Job 3300 is presented in the following section. In addition to the materials requisition, the labour time records (partial) or the week that these tables were made are presented. Other products were also being produced during that week, so not all labour belongs to Job 3300, but all labour belonging to Job 3300 is shown.
Requirements:
1. Calculate the total for the Materials Requisition form. Post the information from the Materials Requisition form to the Job Cost Record.
2. Complete the labour time records for each of the employees and post the information to Job 3300 to the Job Cost Record.
3. Complete the Job Cost Record.
Correct Answer:
Verified
Q50: Custom Cedar Products (CCP) manufactures a line
Q51: Custom Cedar Products (CCP) manufactures a line
Q52: A document that accumulates job costs is
Q53: When used, raw materials
A) would be classified
Q54: When direct materials are requisitioned, they flow
Q56: Assigning direct costs to a cost object
Q57: Custom Cedar Products (CCP) manufactures a line
Q58: An internal request for raw materials calls
Q59: Which comes second in the flow of
Q60: Which comes third in the flow of
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents