The outputs from a work measurement study leads to development of labor and equipment standards that are used for all of the following except
A) Estimating workforce capacity
B) Fatigue and personal needs allowances
C) Determining the cost of new work procedures
D) Providing accurate information for scheduling and sequencing
Correct Answer:
Verified
Q1: At an 80% learning rate, if the
Q3: Job and process analysis should follow work
Q4: For a time study, it is assumed
Q5: A 90% learning curve implies faster learning
Q5: The learning curve does not apply to
Q7: Unavoidable delays should not be included in
Q8: A Performance Rating Factor (PRF) of 1.15
Q9: A Performance Rating Factor (PRF) of 130%
Q10: After developing a pre-determined standards, stop-watch or
Q19: Normal time needs to be adjusted for
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents