The manager at a sewing factory uses a piece rate pay system.She has just received an order for 600 dresses from the discount house downtown.She is trying to figure out what her costs are for the project.She has conducted a time study and found operations take this long:
2 minutes to sew one sleeve
3 minutes to sew body of the dress
3.5 minutes to hem all unfinished edges
1 minute to attach the collar
3 minutes to attach all buttons
The workers must sit idle while they wait for supplies on the conveyor belt for an average of 30 seconds.Their performance rating is equal to one.She pays the workers $6.00 per hour.
a.What is the allowance factor for the operation?
b.What is the labor standard (in minutes) per dress?
c.What is the labor cost per dress?
d.What is the labor cost for the entire order of 600 dresses?
Correct Answer:
Verified
View Answer
Unlock this answer now
Get Access to more Verified Answers free of charge
Q33: Define work measurement and what it leads
Q40: Define work sampling.Give both manufacturing and service
Q41: For a work sampling study, there is
Q42: Locksmith Inc.has an order from a bank
Q43: Based on data from a work sampling
Q45: A manufacturer made a commitment to supply
Q46: A yacht manufacturer signed a contract to
Q48: For a work sampling study, there is
Q49: A manufacturer made a commitment to supply
Q49: A fast food stand has a thriving
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents