Solved

A Manufacturer Is Considering Some Expansion Alternatives If the Forecast of Additional Demand for the Next Year

Question 62

Essay

A manufacturer is considering some expansion alternatives. One is to increase the capacity at their present location. A second set of alternatives is to build a new plant at one of two possible locations. The projected operating costs have been estimated as follows:
Cost CategoryExpand at Present LocationLocation A Location B Fixed $125,000$225,000$175,000 Direct labor per unit $32.5$30$33 Direct material per unit $16$17$15.50 Overhead cost per unit $2.902.40$2.50 Transportation cost per 100 units $125$100$110\begin{array}{lccc} \underline{\text {Cost Category}}& \underline{\text {Expand at Present Location}}& \underline{\text {Location A }}& \underline{\text {Location B}}\\\text { Fixed } & \$ 125,000 & \$ 225,000 & \$ 175,000 \\\text { Direct labor per unit } & \$ 32.5 & \$ 30 & \$ 33 \\\text { Direct material per unit } & \$ 16 & \$ 17 & \$ 15.50 \\\text { Overhead cost per unit } & \$ 2.90 & 2.40 & \$ 2.50 \\\text { Transportation cost per } 100 \text { units } & \$ 125 & \$ 100 & \$ 110\end{array}
If the forecast of additional demand for the next year is 25,000 units, which alternative should be selected?

Correct Answer:

verifed

Verified

Compute for each alternative:
Total cost...

View Answer

Unlock this answer now
Get Access to more Verified Answers free of charge

Related Questions

Unlock this Answer For Free Now!

View this answer and more for free by performing one of the following actions

qr-code

Scan the QR code to install the App and get 2 free unlocks

upload documents

Unlock quizzes for free by uploading documents