Frank's manufacturing firm has determined that the industry standard process velocity time is 15 seconds. Frank's OM engineer has determined that their process velocity time is 17 seconds with a throughput time of 136 seconds. If the throughput time cannot be changed, what, how much, and by which direction does the value added time need to change so Frank's manufacturing can match the industry standard process velocity?
Correct Answer:
Verified
View Answer
Unlock this answer now
Get Access to more Verified Answers free of charge
Q105: Bazooka Company is thinking about introducing a
Q106: If a firm has fixed costs of
Q107: Tom's hazardous material movement company limits the
Q108: What are the guidelines for design for
Q109: Name a company that hurt its business
Q111: Describe three different types of service designs.
Q112: Languages, Inc. manufactures hand held computers that
Q113: Blaster Radio Company is trying to decide
Q114: Sam Smear owns a manufacturing company that
Q115: What is the break-even volume given a
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents