A Dallas firm manufactures dishwashing liquid.The manager wants to evaluate the performance of station 3,the bottleneck in the filling operation.The following output report is given.
Calculate the cumulative deviation of the output at the end of period 3.
A) -20
B) -40
C) 10
D) 20
E) 40
Correct Answer:
Verified
Q30: What does average number of jobs in
Q37: What does makespan measure?
A) WIP inventory
B) due-date
Q38: What does job flow time measure?
A) the
Q39: The following jobs are waiting to be
Q40: Sweet-Dreams Inc. manufactures custom pillows. Five jobs
Q42: Five jobs must be scheduled.Each of the
Q44: Green Inc.manufactures a variety of wooden desks.Five
Q45: Job A is due on day 15,
Q55: Which of the following scheduling rules is
Q57: Consider a production line with five stations.
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents