Which of the following is true of the duration-based value-stream costing approach?
A) It offers both simplicity and accuracy and, thus, may be well suited for multiple-product value streams.
B) This approach recognizes that some product components take more effort (time) to make than others and thus cost more.
C) In duration-based costing, an adjustment is made to the average product cost that reflects the differences in product features and characteristics.
D) Duration-based costing and features and characteristics costing are used interchangeably.
Correct Answer:
Verified
Q79: Control costs can be subdivided into prevention
Q80: Which of the following is true of
Q81: In lean manufacturing, cell structure of manufacturing
Q82: Assume that facility costs are $350,000 per
Q83: Which of the following is true of
Q85: _ is the time that a unit
Q86: A manufacturing cell within a value
Q87: Learner Company operates a petrochemical plant located
Q88: Which of the following is true of
Q89: Which of the following is true of
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents