Solved

Figure 4-19 Attraction Corporation Produces Specially Machined Parts

Question 146

Multiple Choice

Figure 4-19 Attraction Corporation produces specially machined parts. The parts are produced in batches in one continuous manufacturing process. Each part is custom produced and requires special engineering design activity (based on customer specifications) . Once the design is completed, the equipment can be set up for batch production. Once the batch is completed, a sample is taken and inspected to see if the parts are within the tolerances allowed. Thus, the manufacturing process has four activities: engineering, setups, machining, and inspecting. In addition, there is a sustaining process with two activities: providing utilities (plantwide) and providing space. Costs have been assigned to each activity using direct tracing and resource drivers:
Figure 4-19 Attraction Corporation produces specially machined parts. The parts are produced in batches in one continuous manufacturing process. Each part is custom produced and requires special engineering design activity (based on customer specifications) . Once the design is completed, the equipment can be set up for batch production. Once the batch is completed, a sample is taken and inspected to see if the parts are within the tolerances allowed. Thus, the manufacturing process has four activities: engineering, setups, machining, and inspecting. In addition, there is a sustaining process with two activities: providing utilities (plantwide)  and providing space. Costs have been assigned to each activity using direct tracing and resource drivers:   Activity drivers for each activity have been identified and their practical capacities listed:   The costs of facility-level activities are assigned using machine hours. Refer to 4-19. What is (are)  the facility-level activity(ies) ? A)  set-ups B)  inspecting C)  providing space D)  both a and b Activity drivers for each activity have been identified and their practical capacities listed:
Figure 4-19 Attraction Corporation produces specially machined parts. The parts are produced in batches in one continuous manufacturing process. Each part is custom produced and requires special engineering design activity (based on customer specifications) . Once the design is completed, the equipment can be set up for batch production. Once the batch is completed, a sample is taken and inspected to see if the parts are within the tolerances allowed. Thus, the manufacturing process has four activities: engineering, setups, machining, and inspecting. In addition, there is a sustaining process with two activities: providing utilities (plantwide)  and providing space. Costs have been assigned to each activity using direct tracing and resource drivers:   Activity drivers for each activity have been identified and their practical capacities listed:   The costs of facility-level activities are assigned using machine hours. Refer to 4-19. What is (are)  the facility-level activity(ies) ? A)  set-ups B)  inspecting C)  providing space D)  both a and b The costs of facility-level activities are assigned using machine hours.
Refer to 4-19. What is (are) the facility-level activity(ies) ?


A) set-ups
B) inspecting
C) providing space
D) both a and b

Correct Answer:

verifed

Verified

Unlock this answer now
Get Access to more Verified Answers free of charge

Related Questions

Unlock this Answer For Free Now!

View this answer and more for free by performing one of the following actions

qr-code

Scan the QR code to install the App and get 2 free unlocks

upload documents

Unlock quizzes for free by uploading documents