Figure 4-20 Quasi-Tech Corporation produces specially machined parts. The parts are produced in batches in one continuous manufacturing process. Each part is custom produced and requires special engineering design activity (based on customer specifications) . Once the design is completed, the equipment can be set up for batch production. Once the batch is completed, a sample is taken and inspected to see if the parts are within the tolerances allowed. Thus, the manufacturing process has four activities: engineering, setups, machining, and inspecting. Costs have been assigned to each activity using direct tracing and resource drivers:
Owens produces two models: Model X and Model Y. The following table shows how the two products consume activity.
Refer to Figure 4-20. How much overhead is assigned to Model D using the 4 activity drivers?
A) $560,000
B) $2,060,000
C) $2,640,000
D) $2,820,000
Correct Answer:
Verified
Q1: If activity-based costing is used, setups would
Q9: If activity-based costing is used, insurance on
Q28: If activity-based costing is used, security is
Q40: If activity-based costing is used, materials handling
Q147: Which of the following quantities is an
Q153: Figure 4-17 X-TREME Corporation has the following
Q154: Figure 4-17 X-TREME Corporation has the following
Q155: Batch-level costs are assigned using
A)non-unit-based activity drivers.
B)unit-based
Q160: If activity-based costing is used, electricity usage
Q161: Figure 4-21 Appleby Manufacturing uses an activity-based
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents