Solved

Figure 15-1 the Following Information Relates to Lancashire Manufacturing

Question 46

Multiple Choice

Figure 15-1 The following information relates to Lancashire Manufacturing:
To produce a unit of product:
Figure 15-1 The following information relates to Lancashire Manufacturing: To produce a unit of product:   There is a wait time of 8 minutes before the mixing department begins a batch, 5 minutes between the mixing and molding departments, a move and pre-wait between molding and casting of 10 minutes, and a move and pre-wait between the casting and finishing departments of 12 minutes. Refer to Figure 15-1. Which area represents the bottleneck operation? A)  finishing B)  casting C)  molding D)  mixing There is a wait time of 8 minutes before the mixing department begins a batch, 5 minutes between the mixing and molding departments, a move and pre-wait between molding and casting of 10 minutes, and a move and pre-wait between the casting and finishing departments of 12 minutes.
Refer to Figure 15-1. Which area represents the bottleneck operation?


A) finishing
B) casting
C) molding
D) mixing

Correct Answer:

verifed

Verified

Unlock this answer now
Get Access to more Verified Answers free of charge

Related Questions

Unlock this Answer For Free Now!

View this answer and more for free by performing one of the following actions

qr-code

Scan the QR code to install the App and get 2 free unlocks

upload documents

Unlock quizzes for free by uploading documents