In a lean production system,kanban systems have been shown to handle large fluctuations in the production requirements on the final assembly line.
Correct Answer:
Verified
Q31: The pull system was developed by Ohno
Q32: In the dual kanban system,a withdrawal kanban
Q32: The authority for a worker to stop
Q33: Reducing variability in production through more accurate
Q34: In lean production,a strong relationship exists between
Q35: Flexible resources is a basic element of
Q38: Internal setup activities can be performed when
Q40: Mixed-modeling sequencing is used at Toyota to
Q42: _ is generally credited with the development
Q46: A workstation must produce 400 units an