Steel Incorporated uses a job-order costing system and a predetermined overhead rate based on machine hours.
At the beginning of the year,the company estimated manufacturing overhead for the year would be $240,000 and machine hours would be 8,000.
The following information pertains to November of the current year:
December production activity:
Actual manufacturing overhead cost incurred in November was $61,000.
Required:
A. Compute the predetermined overhead application rate.
B. Determine the total cost associated with each job.
C. If Jobs 10 and 12 were completed, prepare the journal entry to move the cost.
D. If Job 10 was delivered to customers that paid cash, prepare the journal entries.
E. What is the gross profit for Job 10 ?
F. What is the cost assigned to ending work in process?
G. Assuming no beginning finished goods, what is the cost assigned to ending finished
goods?
H. How much was overhead overapplied or underapplied?
Correct Answer:
Verified
Q155: Refer to Baldwin,Inc.
A. Calculate the per-unit
Q157: Green Oak Farm Equipment is a
Q158: Giant Company is a job-order costing
Q159: The following information was taken from
Q161: Match each following terms with their correct
Q163: Match the following cost flows with the
Q164: Answers may be used more than once.
-Form
Q171: Match each item with the correct statement
Q184: Match each following terms with their correct
Q191: Match each following terms with their correct
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents