Suppose that you have calculated the control limits for a p-chart to be the following:
LCL = 0.02 and UCL = 0.08.
Today, you took 10 samples of 20 units each. The first nine samples each had one defect. The last sample had zero defects. What can you conclude?
A) the process is out of control
B) the process is in a state of control
C) the last sample should be ignored because it was "too good"
D) you calculated the limits incorrectly because the LCL must be either negative or 0
E) the sample size must be increased
Correct Answer:
Verified
Q59: A process capability index (Cp) value of
Q60: What are the two aspects to implementing
Q61: An important task in quality control is
Q62: Statistical quality control is a subset of
Q63: What program at Intel enforces the policy
Q65: Suppose that Matt wants to use a
Q66: Suppose that you want to monitor the
Q67: Each day for two workweeks (10 days
Q68: Acceptance sampling occurs after the product has
Q69: Descriptive statistics are used to describe quality
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents