A Dallas firm manufactures dishwashing liquid. The manager wants to evaluate the performance of station 3, the bottleneck in the filling operation. The following output report is given.
Calculate the cumulative deviation of the output at the end of period 3.
A) -20
B) -40
C) 10
D) 20
E) 40
Correct Answer: