If using slack per remaining operations (S/RO) as the scheduling rule, the job with the least slack per remaining operations has the highest priority.
Correct Answer:
Verified
Q93: EDD always minimizes mean job flow time.
Q94: Makespan is a measure of WIP.
Q95: The process batch should be variable.
Q96: Firms should balance the flow rather than
Q97: Makespan has a link to customer due
Q99: If using critical ratio (CR) as the
Q100: Using the Tibrewala, Phillippe, and Brown technique
Q101: Terry's cycle shop standard hour input/output report
Q102: What are the three kinds of constraints
Q103: What is a transfer batch?