Job A has a flow time of 20 days, job B has a flow time of 13 days, job C has a flow time of 12 days, and job D has a flow time of 15 days. If the time it takes to finish all four jobs (as a whole batch) is 15 days, what is the average number of jobs in the system?
Correct Answer:
Verified
Q105: Define job lateness.
Q106: The following jobs are waiting to be
Q107: Desire Inc. produces a variety of pediatric
Q108: What is the mean job flow time
Q109: The following jobs must be processed in
Q111: Optimized production technology (OPT) was introduced by
Q112: The following jobs need to be processed
Q113: Define what slack is.
Q114: Define Johnson's rule.
Q115: Using the following data, calculate the average
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents