Figure 4-19 Owens Corporation produces specially machined parts.The parts are produced in batches in one continuous manufacturing process.Each part is custom produced and requires special engineering design activity (based on customer specifications) .Once the design is completed, the equipment can be set up for batch production.Once the batch is completed, a sample is taken and inspected to see if the parts are within the tolerances allowed.Thus, the manufacturing process has four activities: engineering, setups, machining, and inspecting.In addition, there is a sustaining process with two activities: providing utilities (plantwide) and providing space.Costs have been assigned to each activity using direct tracing and resource drivers:
Activity drivers for each activity have been identified and their practical capacities listed:
The costs of facility-level activities are assigned using machine hours.
-
Refer to 4-19.What is (are) the facility-level activity(ies) ?
A) providing utilities
B) providing space
C) inspecting
D) both a and b
Correct Answer:
Verified
Q10: Maintenance of the production equipment would be
Q12: If activity-based costing is used, electricity usage
Q106: Figure 4-21 Jones Manufacturing uses an activity-based
Q107: Figure 4-18 Ubben Manufacturing uses an activity-based
Q110: Figure 4-18 Ubben Manufacturing uses an activity-based
Q112: Figure 4-19 Owens Corporation produces specially machined
Q113: Figure 4-20 Owens Corporation produces specially machined
Q114: Batch-level costs are assigned using
A) unit-based activity
Q115: Figure 4-20 Owens Corporation produces specially machined
Q116: Figure 4-20 Owens Corporation produces specially machined
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents