Figure 15-2 The following information relates to Ramesy Manufacturing:
To produce a unit of product:
There is a wait time of 5 minutes before the cutting department begins a batch, 15 minutes between the cutting and welding departments, a move and pre-wait between welding and polishing of 12 minutes, and a move and pre-wait between the polishing and finishing departments of 8 minutes.
-
Refer to Figure 15-2.If Ramesy produces in batches of 10 units, how much time would have elapsed by the time the 10th unit is produced under a manufacturing cell environment (assuming the cell is processing continuously) ?
A) 65 minutes
B) 60 minutes
C) 150 minutes
D) some other amount
Correct Answer:
Verified
Q32: Why might labor costs be reduced in
Q33: Figure 15-2 The following information relates to
Q38: Which of the following is a reason
Q39: Emphasis on departmental efficiency
A) causes bottleneck departments
Q42: Figure 15 - 3 Based on the
Q63: Which of the following is NOT a
Q64: In the calculation of product costs for
Q67: Which of the following is NOT considered
Q70: The only allocation used regularly in a
Q83: What approach is normally used to calculate
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents