Figure 15-2 The following information relates to Ramesy Manufacturing:
To produce a unit of product:
There is a wait time of 5 minutes before the cutting department begins a batch, 15 minutes between the cutting and welding departments, a move and pre-wait between welding and polishing of 12 minutes, and a move and pre-wait between the polishing and finishing departments of 8 minutes.
-
Refer to Figure 16-2.What is the production rate?
A) 12 units per hour
B) 20 units per hour
C) 15 units per hour
D) 7.5 units per hour
Correct Answer:
Verified
Q17: Which of the following is NOT a
Q18: In a traditional manufacturing setup
A) there is
Q19: One way to identify value streams is
Q27: Figure 15-1 The following information relates to
Q50: In a demand-pull system
A)production is triggered by
Q53: The production rate
A) tells how many units
Q55: The value stream
A)is made up of all
Q71: If a facility has costs of $100,000
Q73: In a lean environment, many overhead costs
Q76: Which of the following is true in
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents