Using average product cost for a value stream means that individual product costs are not known.This is adequate mainly because
A) waste can be eliminated at the activity and process level without knowing product costs.
B) a fully accurate product cost is not needed for many decisions.
C) standard costing variances may actually impede improvement decisions.
D) all of these.
Correct Answer:
Verified
Q48: Figure 15-4 Q50: The lean control system uses a _ Q51: Figure 15-4 Q53: In calculating product costs for a value Q54: Figure 15-4 Q55: _ is the point at which technical Unlock this Answer For Free Now! View this answer and more for free by performing one of the following actions Scan the QR code to install the App and get 2 free unlocks Unlock quizzes for free by uploading documents![]()
![]()
![]()