Consider a Single-Line, Single-Server Waiting Line System ) Need to Be?
B) What Is the Probability of Is
Consider a single-line, single-server waiting line system. Suppose that there is only physical space for 2 units in the system (one in line and one being served). The arrival rate λ is 80 people per hour. The manager, Johnny Three Toes, has the choice among workers of different speeds to be the server. He wants to save money by hiring the slowest server that will result in an average number of units in the system (L) equal to 2.
a) Using Johnny Three Toes' strategy, what will the server's service rate per hour ( ) need to be?
b) What is the probability of having 3 or more units in the system?
c) What is wrong with Johnny Three Toes' strategy?
Correct Answer:
Verified
View Answer
Unlock this answer now
Get Access to more Verified Answers free of charge
Q101: What are the five characteristics that define
Q102: Consider a single-line, single-server waiting line system.
Q103: In designing service systems, the main challenge
Q104: The university replication facility provides copier repair
Q105: Consider a single-line, single-server waiting line
Q107: Consider a single-line, single-server waiting line system.
Q108: Consider a single-line, single-server waiting line system.
Q109: Consider a single-line, single-server waiting line system.
Q110: Any time there is more customer demand
Q111: Consider a single-line, single-server waiting line system.
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents