Without kanbans, the withdrawal and production of materials
A) can continue in a reduced manner
B) will not be well coordinated
C) cannot take place
D) would continue based on historical needs
E) would continue based on forecasted needs
Correct Answer:
Verified
Q34: According to JIT, by eliminating inventory we
Q35: What must happen before it is possible
Q36: JIT manufacturing cannot succeed if _costs are
Q37: The ultimate goal of JIT is to
Q38: In JIT a Kanban card is used
Q40: JIT relies on a _ that withdraws
Q41: Quality problems in manufacturing can come from
Q42: According to JIT, workers should perform
A) system
Q43: Quality in just-in-time is centered on building
Q44: External setups
A) Are the same as single
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents