What results from methods analysis?
A) a graph of how long each step takes
B) an evaluation of current employees
C) time standards
D) guidance for designing jobs
E) a standard, detailed procedure for an operation
Correct Answer:
Verified
Q22: In calculating the time standard, the frequency
Q23: What is the governmental agency that has
Q24: Standard times can be used to measure
Q25: A company uses standard times for _.
A)
Q26: What does work measurement determine?
A) how long
Q28: What is the effect of an increase
Q29: What is the methods analysis chart that
Q30: Which of the following is not taken
Q31: The _ time is the time it
Q32: The formula for determining the number of
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents