For each work element in the time study, multiplying the mean observed time by the performance rating factor by the frequency of occurrence results in what?
A) the normal time for the element
B) the average observed time for the element
C) the standard time for the element
D) the average delay for the element
E) the standard time for the job
Correct Answer:
Verified
Q53: Which of the following is not characteristic
Q54: The allowance factor is computed by adding
Q55: In a time study, personal time, fatigue,
Q56: A company's accepted time studies are stored
Q57: If OT = the mean observed time,
Q59: In work sampling, when should observations be
Q60: Which of the following would not be
Q61: A worker performed a particular task for
Q62: Methods analysis eliminates unnecessary tasks and improves
Q63: The first unit of a product took
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents