A Dallas firm manufactures dishwashing liquid. The manager wants to evaluate the performance of station 3, the bottleneck in the filling operation. The following output report is given.
Calculate the cumulative deviation of the output at the end of period 3.
A) -20
B) -40
C) 10
D) 20
E) 40
Correct Answer:
Verified
Q31: The following jobs are waiting to be
Q32: What is Period 3's standard hour deviation
Q33: The following jobs are waiting to be
Q34: The following jobs are waiting to be
Q35: Using the S/RO rule, which of the
Q37: What does makespan measure?
A) WIP inventory
B) due-date
Q38: What does job flow time measure?
A) the
Q39: A measure of response time is:
A) makespan
B)
Q40: Sweet-Dreams Inc. manufactures custom pillows. Five jobs
Q41: Green Inc. manufactures a variety of wooden
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents