Following are the budgeted costs for a manufacturing plant producing custom products: Materials (70% direct and 30% indirect) $15,000
Labour (60% direct and 40% indirect) 12,000
Supervision 5,000
Amortization 10,000
Utilities 4,860
Total $46,860
The company uses a normal costing system and overhead is allocated on the basis of direct labour cost. If actual direct labour cost was $7,500, the overhead allocated was:
A) $29,160
B) $20,688
C) $30,375
D) $48,813
Correct Answer:
Verified
Q44: When overhead is underapplied:
A) Cost of goods
Q51: The denominator in an overhead allocation rate
Q53: A costing system that charges jobs with
Q53: Asadi Company uses a job costing system
Q54: Kelita's Kar Kare Kompany had the following
Q59: Assume there is $2,000 of overapplied fixed
Q60: Asadi Company uses a job costing system
Q62: The cost of normal spoilage arising from
Q66: Rework costs are:
A) Always tracked
B) Never tracked
C)
Q79: Units of product that are unacceptable and
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents