Select the most desirable outcome for a Six Sigma project in Phlebotomy from the following:
A) a reduction in the number of patient identification errors.
B) a reduction in the number of unacceptable quality control results .
C) an increase in the number of failed Delta checks.
D) a reduction in the amount of time needed to correct patient identification errors.
Correct Answer:
Verified
Q87: The Six Sigma System utilizes the acronym
Q88: A team of phlebotomists is working the
Q89: A phlebotomy supervisor discovers that a phlebotomist
Q90: After collecting several evacuated tubes from a
Q91: A phlebotomist is collecting sample for a
Q93: A phlebotomist finishes collecting a sample for
Q94: An error in identifying a patient properly
Q95: A primary goal of Six Sigma is
Q96: A phlebotomist is performing point-of-care (POC) glucose
Q97: A phlebotomy supervisor is interested in studying
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents