The St. Augustine Corporation originally budgeted for $360,000 of fixed overhead at 100% production capacity. Production was budgeted to be 12,000 units. The standard hours for production were 5 hours per unit. The variable overhead rate was $3 per hour. Actual fixed overhead was $360,000 and actual variable overhead was $170,000. Actual production was 11,700 units. Compute the factory overhead volume variance.
A) $9,000F
B) $9,000U
C) $5,500F
D) $5,500U
Correct Answer:
Verified
Q110: The controllable variance measures
A) operating results at
Q115: The following data is given for the
Q116: Q118: Which of the following would not lend Q119: Favorable volume variances may be harmful when: Q121: If a company records inventory purchases at Q123: The total manufacturing cost variance is Q124: The use of standards for nonmanufacturing expenses Q125: Ruby Company produces a chair that requires Q173: The following are inputs and outputs to
A)
A) the
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents