The higher levels of the work breakdown structure WBS) represent increasing amounts of detail while the lower levels represent broad categories of activities.
Correct Answer:
Verified
Q9: A common resource constraint is availability.
Q10: The master schedule is rarely part of
Q11: Most activities in a network diagram have
Q12: If the float on activities that are
Q13: A project that has completed 25 percent
Q15: The unit of measure that is chosen
Q16: During the conceptual phase, detail is required
Q17: Duration is defined as the time from
Q18: Activities that have predecessor-successor relationships occur concurrently.
Q19: A WBS can be decomposed, that is,