Solved

_____ Is a Parametric Model Using Dependent Variables Based Upon

Question 55

Multiple Choice

_____ is a parametric model using dependent variables based upon one or more independent variables that are measures of performance or physical attributes of the system.


A) COCOMO
B) LOC
C) HEURISTICS.
D) CHECKPOINT
E) SLIM

Correct Answer:

verifed

Verified

Unlock this answer now
Get Access to more Verified Answers free of charge

Related Questions

Unlock this Answer For Free Now!

View this answer and more for free by performing one of the following actions

qr-code

Scan the QR code to install the App and get 2 free unlocks

upload documents

Unlock quizzes for free by uploading documents