A small water reactor recently installed at Podunk College is operating at the boiling point of water due to the malfunctioning of the cooling system. The operators observe that the water boils away at the rate of 10 L/min. If they assume that all of the reactor energy is absorbed in the water, the power developed by the reactor is approximately
A)
hp
B) 378 W
C) 56 kW
D) 378 kW
E) 22.7 MW
Correct Answer: