Consider the following to answer the question(s) below:
An operations manager was interested in determining if there is a relationship between the amount of training received by production line workers and the time it takes for them to troubleshoot a process problem. A sample of recently trained line workers was selected. The number of hours of training time received and the time it took (in minutes) for them to troubleshoot their last process problem were captured. The data, scatterplot and regression results are shown below.
-At α = 0.05,
A) we reject the alternative hypothesis.
B) we fail to reject the null hypothesis.
C) we can conclude that there is no significant relationship between amount of training received by production line workers and the time it takes for them to troubleshoot a process problem.
D) we reject the null hypothesis and can conclude that there is a significant relationship between amount of training received by production line workers and the time it takes for them to troubleshoot a process problem.
E) we fail to support the alternative hypothesis and can conclude that amount of training received by production line workers and the time it takes for them to troubleshoot a process are not related.
Correct Answer:
Verified
Q11: Consider the following to answer the question(s)
Q12: Consider the following to answer the question(s)
Q13: Consider the following to answer the question(s)
Q14: Consider the following to answer the question(s)
Q15: Consider the following to answer the question(s)
Q17: Consider the following to answer the question(s)
Q18: Consider the following to answer the question(s)
Q19: Consider the following to answer the question(s)
Q20: Consider the following to answer the question(s)
Q21: Consider the following to answer the question(s)
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents