Butch bought a bulldozer for his construction business from Construction Supply (CS) , which properly perfected its security interest in the machine. The bulldozer required repairs; Butch took it to Mike Mechanic who performed $1100 worth of repair work on it. Butch then failed to pay either CS or Mechanic, and CS appeared at Mechanic's shop to repossess the machine. As between Mechanic and CS, who gets paid first?
A) CS because it perfected its security interest.
B) CS because the bulldozer is not "consumer goods."
C) CS because it has a purchase-money security interest in the bulldozer.
D) Mechanic because he has a mechanic's lien which takes priority over the CS's security interest.
E) It is not possible to determine who wins on the facts here.
Correct Answer:
Verified
Q39: A person who owes money or a
Q40: A surety bond that ensures a property
Q41: Alice Ace was the owner of Ace
Q42: George bought a washing machine from Sears,
Q43: What are the three different types of
Q45: Alice hired Robert as an associate accountant
Q46: The surety has certain defenses to paying.
Q47: Creditor required that Apex Co. obtain a
Q48: Bond Co. is a surety on a
Q49: Smalltown contracted with Construction Co. (CC) to
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents