When only a price is needed from a vendor,the following will likely be requested from the possible vendors:
A) Request for Proposal (RFP)
B) Request for Information (RFI)
C) Request for Quote (RFQ)
D) Request for Efficient Information Distribution (REID)
E) More Optimal Desires (MOD)
Correct Answer:
Verified
Q6: Fixed-price contracts are considered:
A)Very flexible
B)Very rigid
C)Always cheaper
Q19: A time and arrangements deal is considered:
A)Very
Q24: The following document is utilized with possible
Q27: The design phase of the SDLC:
A)Produces a
Q29: Outsourcing is used when:
A)The project has a
Q30: The score column in the Alternative Matrix
Q31: Requests for Proposals (RFPs)should contain
A)Detailed description of
Q33: A Request for Information (RFI)is used with
Q36: Outsourcing can include:
A)Hiring an external vendor
B)Hiring an
Q37: Outsourcing firms called _ supply software applications
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents