If a project holds an 80 per cent probability of high demand and a 20 per cent probability of low demand, then the expected value of the net present value of the two different demand assumptions would give us a weighted average net present value for the project. Such an analysis is called


A) a sensitivity analysis.
B) a scenario analysis.
C) a simulation analysis.
D) none of the above.