Quantity variances for direct cost categories (direct materials and direct labor) are based on differences between the actual inputs used and the standard inputs allowed for the actual output achieved. A key difference in the analysis of quantity variances for direct cost categories and the analysis of the efficiency variance for variable overhead is:
A) An efficiency variance for variable overhead cannot be calculated.
B) The flexible-budget variance for variable overhead is always equal to the efficiency variance for variable overhead.
C) The efficiency variance for variable overhead is based on the cost effectiveness in using the cost-allocation base.
D) The flexible-budget variance for variable overhead is always equal to the spending variance for variable overhead.
E) There is no key difference between the analysis of quantity variances for direct cost categories and the analysis of the efficiency variance for variable overhead; they should be evaluated in exactly the same manner.
Correct Answer:
Verified
Q76: A company uses the following standard costs
Q77: A job was budgeted to require 3
Q78: Bradford Company budgeted 4,000 pounds of material
Q79: Bartels Corp. produces woodcarvings. It takes 2
Q80: The difference between the total budgeted fixed
Q82: For the current period, Boggs Company's manufacturing
Q83: A company's flexible budget for 48,000 units
Q84: Montaigne Corp. has the following information about
Q85: Montaigne Corp. has the following information about
Q86: Brewer Company specializes in selling used cars.
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents