Which of the following correctly demonstrates the comparison of the four-variance method of factory overhead analysis to the two-variance method of factory overhead analysis?
A) The sum of the fixed and variable spending variances in the four-variance method is equal to the flexible-budget variance in the two-variance method.
B) The sum of the fixed and variable spending and variable efficiency variances in the four-variance method is equal to the flexible-budget variance in the two-variance method.
C) The sum of the fixed and variable spending,variable efficiency and production-volume variances in the four-variance method is equal to the flexible-budget variance in the two-variance method.
D) The fixed spending variance in the four-variance method is equal to the flexible-budget variance in the two-variance method.
Correct Answer:
Verified
Q57: Kale Corporation's budgeted fixed factory overhead costs
Q58: If a company uses a two-variance analysis
Q59: In a two-variance system for analyzing factory
Q60: Underapplied factory overhead would result if:
A)Factory overhead
Q61: In a three-variance method of factory overhead
Q63: Perez Company adopted a standard cost system
Q64: The following information pertains to the Braun
Q65: The normal capacity of the Malloy Company
Q66: In a four-variance method analyzing factory overhead,the
Q67: The following information is available from the
Unlock this Answer For Free Now!