MRP II is a computer-based manufacturing administration system that usually has which of the following components?
A) computer-aided design, master production schedule, and group technology
B) master production schedule, material requirements planning, and shop floor control
C) material requirements planning, computer-aided engineering, and master production schedule
D) shop floor control, manufacturing automation protocol, and material requirements planning
Correct Answer:
Verified
Q16: At Around-the-World-Warehouses,a shipping clerk or sales clerk
Q17: Which of the following benefits is associated
Q18: Which of the following statements about service-oriented
Q19: An information system that supports a particular
Q20: In describing a client/server system,the software needed
Q22: A manufacturing computer system that logically groups
Q23: Which of the following is not an
Q24: A client/server system is a particular type
Q25: According to the textbook,which of the following
Q26: An engineering system that uses computer graphics
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents