A production of 300 units of Twiddle Bugs, an educational toy for children, must be completed within 1 week by BugU Manufacturing. Two production lines are available, each for 30 hours during the week. Production line 1 can produce five units per hour and production line 2 can produce four units an hour. Line 1 costs $50 per hour to operate and line 2 costs $55 per hour. Overtime is available for line 1 at $15 per hour and for line 2 at $12 per hour. Management goals in decreasing order are:
P1: Produce 300 units.
P2: Maximum allowable overtime of 6 hours for line 1.
P3: Cost of overtime must not exceed $750.
P4: Avoid the underutilization of either production line. Assign weights that are proportional to their production capability.
P5: Producing more than 300 units is 1-1/2 times as undesirable as producing under 300 units.
-What are the constraints for this problem?
Correct Answer:
Verified
View Answer
Unlock this answer now
Get Access to more Verified Answers free of charge
Q41: Ashley's manufactures home furnishings for department
Q42: An investor has $80,000 to invest in
Q43: Using the normalized matrix given below,
Q44: Assume that a decision maker using
Q45: Assume that a plant manager has
Q47: Assume that a plant manager has
Q48: Ashley's manufactures home furnishings for department
Q49: An investor has $80,000 to invest in
Q50: The analytical hierarchy process was used
Q51: Assume that a decision maker has
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents