Madlantic Devices designs and manufactures high-end medical devices. The facilities in Madison and Atlanta serve as design and component manufacturing facilities. Components are then shipped to warehouses in Philadelphia or Knoxville, where they are held until final assembly is completed at either Dayton, Bloomington, or Albany.
Manufacturing capacity in Madison and Atlanta is 1000 units. Demand at Dayton, Bloomington, and Albany is 450, 500, and 610, respectively.
The network representing the shipping routs is shown below.
Madlantic Devices designs and manufactures high-end medical devices. The facilities in Madison and Atlanta serve as design and component manufacturing facilities. Components are then shipped to warehouses in Philadelphia or Knoxville, where they are held until final assembly is completed at either Dayton, Bloomington, or Albany. Manufacturing capacity in Madison and Atlanta is 1000 units. Demand at Dayton, Bloomington, and Albany is 450, 500, and 610, respectively. The network representing the shipping routs is shown below.    The costs for shipping between each facility is shown below. A blank cell indicates that shipping between two facilities is not permitted.    -The constraint for Philadelphia is A)  X13 + X23 - X35 - X36 - X37 = 0 B)  X13 + X23 - X35 - X36 - X37 ≥ 0 C)  X13 + X23 + X43 - X34 - X35 - X36 - X37 = 0 D)  X13 + X23 + X43 - X34 - X35 - X36 - X37 ≥ 0 The costs for shipping between each facility is shown below. A blank cell indicates that shipping between two facilities is not permitted.
Madlantic Devices designs and manufactures high-end medical devices. The facilities in Madison and Atlanta serve as design and component manufacturing facilities. Components are then shipped to warehouses in Philadelphia or Knoxville, where they are held until final assembly is completed at either Dayton, Bloomington, or Albany. Manufacturing capacity in Madison and Atlanta is 1000 units. Demand at Dayton, Bloomington, and Albany is 450, 500, and 610, respectively. The network representing the shipping routs is shown below.    The costs for shipping between each facility is shown below. A blank cell indicates that shipping between two facilities is not permitted.    -The constraint for Philadelphia is A)  X13 + X23 - X35 - X36 - X37 = 0 B)  X13 + X23 - X35 - X36 - X37 ≥ 0 C)  X13 + X23 + X43 - X34 - X35 - X36 - X37 = 0 D)  X13 + X23 + X43 - X34 - X35 - X36 - X37 ≥ 0
-The constraint for Philadelphia is


A) X13 + X23 - X35 - X36 - X37 = 0
B) X13 + X23 - X35 - X36 - X37 ≥ 0
C) X13 + X23 + X43 - X34 - X35 - X36 - X37 = 0
D) X13 + X23 + X43 - X34 - X35 - X36 - X37 ≥ 0

Correct Answer:

verifed

Verified

Unlock this answer now
Get Access to more Verified Answers free of charge

Related Questions

Unlock this Answer For Free Now!

View this answer and more for free by performing one of the following actions

qr-code

Scan the QR code to install the App and get 2 free unlocks

upload documents

Unlock quizzes for free by uploading documents