Madlantic Devices designs and manufactures high-end medical devices. The facilities in Madison and Atlanta serve as design and component manufacturing facilities. Components are then shipped to warehouses in Philadelphia or Knoxville, where they are held until final assembly is completed at either Dayton, Bloomington, or Albany.
Manufacturing capacity in Madison and Atlanta is 1000 units. Demand at Dayton, Bloomington, and Albany is 450, 500, and 610, respectively.
The network representing the shipping routs is shown below.
The costs for shipping between each facility is shown below. A blank cell indicates that shipping between two facilities is not permitted.
-The constraint for Philadelphia is
A) X13 + X23 - X35 - X36 - X37 = 0
B) X13 + X23 - X35 - X36 - X37 ≥ 0
C) X13 + X23 + X43 - X34 - X35 - X36 - X37 = 0
D) X13 + X23 + X43 - X34 - X35 - X36 - X37 ≥ 0
Correct Answer:
Verified
Q80: Companies A, B, and C supply components
Q81: Companies A, B, and C supply components
Q82: In an assignment problem,
A) one agent can
Q83: A professor needs help from three
Q84: Companies A, B, and C supply components
Q86: Consider the following network representation of shipment
Q87: Madlantic Devices designs and manufactures high-end medical
Q88: Consider the following network representation of shipment
Q89: In the process of evaluating location alternatives,
Q90: A professor needs help from three
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents