The production manager for the Whoppy soft drink company is considering the production of two kinds of soft drinks: regular and diet. The company operates one 8-hour shift per day. Therefore, the production time is 480 minutes per day. During the production process, one of the main ingredients, syrup, is limited to maximum production capacity of 675 gallons per day. Production of a regular case requires 2 minutes and 5 gallons of syrup, while production of a diet case needs 4 minutes and 3 gallons of syrup. Profits for regular soft drink are $3.00 per case and profits for diet soft drink are $2.00 per case.
-Which of the following is not a feasible production combination?
A) 90 R and 75 D
B) 135 R and 0 D
C) 75 R and 90 D
D) 50 R and 50 D
Correct Answer:
Verified
Q65: Given the following linear programming problem that
Q66: Given the following linear program that maximizes
Q67: The production manager for the Whoppy soft
Q68: Which of the following could not be
Q69: For a maximization problem, the shadow price
Q71: For the constraints given below, which point
Q72: Mallory Furniture buys two products for resale:
Q73: For a linear programming problem, assume that
Q74: A shadow price reflects which of the
Q75: For a resource constraint, either its slack
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents