A highway contractor needs to locate a single supply point to provide road building materials to four projects.The four projects,which are all approximately the same magnitude,are located at the following coordinates.Coordinate units are in miles.
a.What is the center of gravity?
b.If a single truck were sent from center-of-gravity to each project and back (four round trips),how many miles would be traveled? (Hint: use the Pythagorean Theorem C = ).
Correct Answer:
Verified
View Answer
Unlock this answer now
Get Access to more Verified Answers free of charge
Q87: Every month, a distribution center will deliver
Q87: A grocery chain is deciding on where
Q90: A school district is considering four locations
Q91: Using the factor ratings shown below,determine which
Q92: A manufacturer of stamped metal auto parts
Q93: A telecommunications firm is planning to lay
Q96: A manufacturing firm is considering three potential
Q98: Service firms choose locations based,in part,on the
Q99: A manager has received an analysis of
Q105: Location decisions of goods-producing companies often assume
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents